MPK411
Connect the cable
Connect the CHT port on the MPK411 controller to Ethernet (LAN) on the Edge Gateway. The Gateway’s PoE Display port is for the cabin screen.
Verify in ONFUSE Connect
Open Devices → this lift’s Gateway → Controller. Match the elevator number to the installation and the reported floor to the cabin’s actual floor.
Last updated 6 days ago
Was this helpful?