Gateway
The Edge Gateway (order code EDGE-GW) links the lift controller, emergency-call hardware, cabin Displays and ONFUSE Connect.
Before you begin
Have the antenna, supplied power cable and an active 4FF SIM with voice and data. Disable the SIM PIN. Sign in to Connect and have an administrator prepare an enabled Operation Profile.
Connect and register the Gateway
- Disconnect power, insert the SIM and close the cover. Attach the antenna and connect the approved 24 V DC barrel supply.
- Allow about one minute for startup. Check reception using the front-panel LEDs.
- In Connect, open Devices → + → Gateway → Scan. Select the Gateway. Enter the elevator number (e.g. 20200000) in Name and enter the site address. Confirm the organization, tap the right arrow, select the prepared configuration and finish. Field setup screenshots
- Check the Gateway appears in Connect. On the Gateway, verify the applied Operation Profile and version.
Local connections
| Gateway port | Connects to |
|---|---|
| POE Display | One Smart Display directly or a PoE-powered switch for two. Display wiring and switch power requirements |
| Ethernet (LAN) | Elevator controller. MPK411 · Core |
| Digital input | Optional shaft or controller-room alarm contact. |
| MicroMatch | Alarm button on the emergency phone. |
| 24 V barrel, SMA female | Gateway power and external cellular antenna, respectively. |
| USB-C | Updates. |
| HDMI, USB-A | Debugging. |
On backup power, the Gateway supplies the connected Smart Display(s) for at least one hour.
Physical buttons
| Button | Action |
|---|---|
| PWR | Powers on the Gateway. Pressing it again while powered has no effect. |
| FUN, under 3 seconds | Shows cellular reception and fetches pending Connect actions. |
| FUN, 3 to under 6 seconds | Starts ONFUSE Wi-Fi and speaks an eight-digit PIN. Enter all digits in Connect → Gateway, including leading zeros. |
| FUN, hold at least 30 seconds, then release | Confirms a factory reset requested in Connect while its 10-minute window is open. |
| R, press and release | Reboots and keeps saved settings. |
Front-panel LEDs
Press FUN for under three seconds. Read all three LEDs together. If the modem cannot return a reading, the previous colors stay on.
| Cellular reception | LED 1 | LED 2 | LED 3 |
|---|---|---|---|
| No signal or no cell reported | 🔴 Red | 🔴 Red | 🔴 Red |
| Weak | 🟠 Orange | 🟠 Orange | 🔴 Red |
| Fair | 🟠 Orange | 🟠 Orange | 🟠 Orange |
| Good | 🟢 Green | 🟢 Green | 🟠 Orange |
| Strongest | 🟢 Green | 🟢 Green | 🟢 Green |
During registration, three green LEDs also indicate that the Gateway is advertising over Bluetooth. Tap Scan in Connect to find it.
Configure and verify
- Operation Profile — Check the profile and version. Use Server connection to test reachability and Refresh profile from server after office changes. The applied profile is stored locally for offline startup.
- Connected Devices — Match the controller and each Display to the installation.
- Testing — Review battery, signal, operator, inputs and last successful test call. Follow the site’s approved procedure for test calls.
- Cloud Connection — Shows the server and device identity. Keep credentials out of screenshots and support messages.
Cable checks · Gateway commands and results
Factory reset
A factory reset erases the Gateway’s local credentials, settings and stored files, including the saved announcement. Have the elevator number, site address and organization ready for setup afterward.
- Request the reset in Connect. Open Devices, select the Gateway and check its elevator number. Go to Settings → Tools → Reset to factory settings and confirm.
- Confirm on the Gateway. Once the Gateway receives the request, you have 10 minutes to complete this step. Press and hold the physical FUN button continuously for at least 30 seconds, then release it before the window expires. The Gateway erases its local data and reboots. If the window expires, send a new request from Connect.
- Set up the Gateway again. Follow First setup in the field to register the Gateway and restore its announcement. Verify the applied profile, controller and Displays, then follow the site’s approved emergency-call test before returning the installation to service.